Tag Archives: K-12 Education

Huron Academy expands operations in Macomb County

Huron Academy, a tuition-free public charter school for 3rd through 7th grade students, expanded its operations in 2015 by purchasing a 19-acre parcel along Utica Road in Clinton Township.

Fun Facts

Scope

The new, $8.4 million, 32,000 square foot, single-story building features 22 classrooms, computer labs; a gymnasium; special spaces for music and art; a science lab; and a state-of-the-art media center. The site was once home to Bishop Gallagher’s athletic fields. Some of the existing athletic fields are preserved for use today.

G2 Services Provided:  G2 Consulting Group worked with Partners in Architecture of Mt. Clemens and provided geotechnical engineering services. G2 also provided special inspections and materials testing services for general contractor Cunningham-Limp Company of Novi.

In addition to special inspections and materials testing, G2 evaluated earthwork operation and utility backfill, foundation construction, masonry evaluation, structural steel evaluation, and interior floor slab and site concrete evaluation.

Challenges / Solutions

G2 Consulting is used to working on tight construction schedules, especially knowing that the school bell will ring for new students in the fall. G2 overcame several challenges with the site which included building pad earthwork with high moisture clay soils that occurred in October and challenging subgrade conditions in the Spring for support of floor slabs and pavements.

Smart. Results. Fast.

G2 Consulting Group provided cost-effective solutions to keep the project moving forward during a tight construction schedule and ensured that school began on time.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Science and Engineering Center Opens at UDJHSA

The Science and Engineering Center opened its doors to students in 2016 and is the largest addition to the campus since the main school building was constructed in 1931. The center represents the largest dollar investment in science and technology at any Michigan high school in recent years and positions U of D Jesuit as a leader in STEM education in Southeast Michigan.

Fast Facts

Scope

The new $16 million, four-story, 40,000 square foot addition artfully blends historic features of the original structure with artwork and iconography. Located between the main school building and Jesuit residence, the state-of-the-art facility doubles the classroom and laboratory space for biology, chemistry, and physics; adds laboratory space for eco-car and robotics programs, engineering activities; and it includes dedicated classrooms and laboratories for seventh and eighth grade students.

G2 Services

Working with Wold Architects and McCarthy and Smith, Inc., G2 Consulting Group provided geotechnical engineering services and performed special inspections and materials testing during construction.

Challenges / Solutions

Challenged with upper weak or loose sands with more competent clay soils deeper, G2 performed extensive analysis to provide improved support for the building foundations..

Smart. Results. Fast.

G2’s value engineering helped optimize foundation sizes and reduce overall construction costs.

 

FacebooktwitterlinkedinFacebooktwitterlinkedin