Tag Archives: geotechnical investigations

Korean United Methodist Church

Troy, Michigan

The Korean United Methodist Church in Troy, MI, discovered they needed more space to worship and gather together for their growing church community. They turned to Cunningham-Limp Development Company in early January 2016 to assist them in conceptualizing a new addition for their church.

Fast Facts

Project Owner

Korean United Methodist Church

Scope

The Korean United Methodist Church constructed a single-story, steel-framed slab-on-grade addition to its existing facility. It was also necessary to construct a new parking area, provide associated utilities and create a 4-1/2 foot deep detention pond. By the end of the summer of 2016, it was completed.

G2 Services Provided

Geotechnical Investigation

Special Inspections and Materials Testing

Challenges / Solutions

As on many of Cunningham-Limp Development Company projects, G2 Consulting Group provided the geotechnical investigation prior to construction and construction engineering services during construction. These services included: observing earthwork operations and utility installation; performing foundation inspection and concrete inspection for foundations, flatwork and site concrete; performing structural steel evaluation; and observing bituminous concrete and Portland cement concrete pavement construction.

G2 determined and evaluated the general subsurface conditions at the site and developed related foundation recommendations for support of the proposed structure. G2 also recommended new pavement design and provided construction considerations for the new development.

How did we accomplish “Smart. Results. Fast”?

Significant geotechnical investigation was performed in a short period of time. G2 provided preliminary design recommendations shortly after completion of the field report which allowed the construction team to move forward quickly with the project. During construction, G2 observed construction activities and advised the contractor accordingly to conform with project specifications.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Detroit Country Day School Black Box Theater Expansion

Detroit Country Day School in Beverly Hills, MI., expanded its performing arts facility to enhance its nationally recognized program. The school provides students with a well-rounded liberal arts education in academics, athletics, and the arts. The Fine and Performing Arts Department at Country Day School provides a comprehensive arts program to support the school’s commitment to superior education. Drama, theater, music, visual arts, and dance courses enable students to reach their full potential and encourage students to experiment with and develop creativity.

Fast Facts

Project Owner

Detroit Country Day School

Scope

The 6,300 square-foot, two-story addition features a full cat walk and tension grid with highly specialized mechanical and electrical systems. In addition, spaces include two offices and staging scene shop for performances.

Working with Cunningham-Limp, G2 Consulting Group provided geotechnical engineering and special inspection / material testing for the new Black Box Theater Expansion.

G2 provided special inspections and material testing during construction including evaluation of earthwork operation and utility backfill, foundation construction, masonry evaluation, pre-cast plank and structural steel evaluation, and interior floor slab and site concrete evaluation.

G2 Services Provided

Geotechnical Engineering
Special Inspection and Materials Testing

Challenges/Solutions

  • Tight timelines while working in an active school campus environment.

Smart. Results. Fast. Site conditions were less than ideal. G2 developed cost effective solutions and offered real time response to testing and inspection needs, maintaining an aggressive construction schedule.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Telecommunication Sites In U.S. and Canada

 

“Can you hear me now?” “That’s powerful.”  For more than two decades, G2 Consulting Group has helped North America stay connected.  G2 engineers are registered in 30+ states and Canada. We perform geotechnical and tower foundation investigations for numerous companies on telecommunication sites. Oftentimes these sites are located in remote areas which require a significant amount of planning prior to site visits to ensure work is completed as efficiently as possible since return trips to sites would be cost prohibitive. G2 uses an extensive network of drillers and excavators across the country to complete such projects on time and on budget.

Fast Facts

Project Owner
Several major telecommunication companies

Project Scope
Geotechnical Investigation
Tower Foundation Investigation

Services Provided
Geotechnical Investigation
Tower Foundation Investigation

Challenges/Solutions

G2 Consulting Group often performs geotechnical and tower foundation investigations for telecommunication sites at remote locations. These sites require efficient use of time and resources to keep projects within schedule and on budget.

Telecommunication companies are under increased pressures to provide quality cellular services to their customers quickly, whenever and wherever. G2’s expertise provides solutions to each situation at each site. Our vast network of drillers enables us to schedule field operations anywhere in the U.S. We know which methods to use and the proper equipment needed to map foundations accurately and avoid delays.

Smart. Results.Fast.G2 meets tight schedules for our telecommunications clients. We use our vast network of drillers to schedule field operations and expedite projects. We plan, evaluate, and act knowing which methods and equipment to use to avoid delays.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Troy School District Facilities Improvement Project

Troy, Michigan

Troy School District implemented a $125 million program of improvements needed to maintain healthy, safe, and suitable learning environments for its students. These improvements included building components, energy savings initiatives, facilities maintenance, and additions. G2 Consulting Group assisted in this district-wide project, working with TMP Architecture and Barton Malow Company.

Fast Facts

Project Owner

Troy School District

Scope

G2 provided geotechnical investigation services for Larson and Boulay Park Middle Schools, and Troy and Athens High Schools. The middle schools and Troy High completed classroom additions; Athens constructed a secure entrance and canopy.

G2 also provided construction testing services for new and reconstructed parking lots and secure entrance additions at elementary schools, including Morse, Bernard, Troy Union, Martell, Costello, and Wattles.

G2 Services Provided

Geotechnical and Construction Engineering
Materials Testing

Challenges/Solutions

    • Deep fill soils with organic matter were present at many of the elementary schools where new pavements and bus loops were constructed. These soils cannot support pavement. G2 developed recommendations including geotextile and a thickened section for undercutting, reducing construction costs for the new pavement sections.
    • Executing a project of this magnitude in an abbreviated timespan requires extremely efficient execution. Because G2 is located near all of the construction sites, we were readily available to the contractor for on site testing services. Project managers were also available when an inspection question arose. This minimized potential delays in the construction schedule.

Smart. Results. Fast. Site conditions were less than ideal for a number of the planned construction projects. G2 developed cost effective solutions and offered real time response to testing and inspection needs at 11 different sites, maintaining an aggressive construction schedule.