Tag Archives: Bruce Wilberding

City of Livonia Street Repair Program

Handwork - Concrete

Detailed handwork takes place on the streets of Livonia, MI.

mainline paving

Workers pour concrete into forms in City of Livonia Street Repair program.

Livonia, Michigan

G2 Consulting Group, LLC, works side-by-side with Anderson, Eckstein, and Westrick, Inc., on the City of Livonia Street Repair program. This is part of a 10-year renewal millage approved in 2012. The Department of Public Works evaluates the condition of the City’s roads based on a PASER rating and divides the work into three categories: reconstruction, rehabilitation, or maintenance. During construction season, G2 Consulting’s Construction Engineering team works on multiple streets everyday evaluating subgrade preparation, aggregate base placement, and concrete / asphalt paving operations. Each of our construction engineering technicians and staff engineers are fully qualified with appropriate certifications to perform required field and laboratory tests.

Fast Facts

Project Scope
Dozens of streets in the City of Livonia are being reconstructed, rehabilitated, or maintained under the Street Repair program. Multiple, concurrent monitoring and testing of sites occurs requiring coordination and communication among contractors, technicians, and the owner. 

Construction Observation Documentation and Testing Services:

• Provides field inspector to observe and document construction activities

• Evaluates subgrade preparation, aggregate base placement, and concrete / asphalt paving operations

• Monitors and documented the delivery of project materials

• Reviewes contractor payment submittals

Challenges/Solutions

G2 Consulting Group works on dozens of street projects operating concurrently every day. The challenge is to work efficiently, communicate well with owners and contractors, as well as, G2 project managers, and bring back accurate results quickly so that the project can succeed according to plans and specifications. G2 uses technology to its fullest capacity to communicate crucial data on site and at the laboratory. 

Smart. Results. Fast.

G2 Consulting Group provided cost-effective solutions,  constant communication and collaboration, and exceptional field and laboratory testing to this on-going project.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Macomb Correctional Facility – Pavement Rehabilitation Project

Pavement engineering

The Macomb County Correctional Facility rehabilitated its pavement to improve parking lots and walking paths.

New Haven, Michigan

When the Macomb County Correctional Facility required new driveways, roadways, sidewalks, a walking track, and basketball courts, G2 Consulting Group acquired the necessary background clearances for staff and provided geotechnical investigation services, and special inspections / materials testing services within the correctional facility.

Fast Facts

Project Scope
G2 performed a geotechnical investigation for earthwork operations, foundation design, and construction considerations and performed special inspections and materials testing services during construction.

G2 professionals explored the site during the geotechnical investigation for a complete pavement repair program. This included pavement recommendations and construction considerations related to roadway and driveway access and service equipment.

Within the correctional facility, G2 performed special inspections / materials testing scope of services that included evaluating earthwork operations, utility installation, flatwork, and site concrete, and bituminous paving. 

Services Provided
Geotechnical Investigation
Special Inspections and Materials Testing

Challenges/Solutions

G2 Consulting Group evaluated the existing conditions and provided solutions that allowed for work within a highly regulated correctional facility. The pavement repair strategy needed to work around the confines of correctional facility rules and regulations and also work within an expedited timeline. G2 worked with Anderson, Eckstein, and Westrick, LLC, to create a removal pl

an that allowed for efficient, expedited removal of materials without disrupting the operations of the correctional facility. 

Smart. Results. Fast.

G2 Consulting Group provided cost-effective solutions to keep the project moving forward during a tight construction schedule.