Water/Wastewater

  • Water Storage Tank Washington Township, Michigan Washington Township constructed a new 100-foot diameter, 1.5 million gallon water storage tank to help meet the needs ...
  • Lavergne Avenue Sewer Project , Tunnel and Reservoir Plan Chicago, Illinois Chicago Department of Water Management constructed a relief sewer, including a series of drop shafts, drain connections, catch basins and ...
  • Dugway Tunnel Project Cleveland, Ohio Part of Cleveland’s long term plan to control sewage discharges into Lake Erie, the $179 million Dugway Storage Tunnel ...
  • Ann Arbor Wastewater Treatment Plant Upgrade Ann Arbor, Michigan Rehabilitation of the Ann Arbor Wastewater Treatment Plant was the largest capital project undertaken in the city’s recent history. The ...
  • Clintondale Pump Station Clinton Township, Michigan After nearly four decades of service, the Clintondale Pump Station was experiencing serious problems: its three, 500 horse ...
  • Bay Area Water Treatment Plant Bay County, Michigan A project that was four decades in the making – construction on a new $59.6 million, 40,893-square-foot Bay Area ...
  • Connor Creek CSO Control Improvements Detroit, Michigan G2 provided geotechnical engineering services for Connor Creek CSO (PC-739), a Detroit Water and Sewer Department Wastewater Collection System construction ...
  • Belle Isle CSO Control Improvements Detroit, Michigan G2 provided engineering services during construction of a new 90 foot by 45 foot retention basin for the control ...
  • Oakland County Stream Bank Protection Oakland County, Michigan G2 provided geotechnical investigation services for several Oakland County Stream Bank Projects in the Village of Bingham Farms, Michigan ...