Oakland County Stream Bank Protection

Oakland County, Michigan

G2 provided geotechnical investigation services for several Oakland County Stream Bank Projects in the Village of Bingham Farms, Michigan to construct erosion protection systems.  Water mains and sanitary sewer lines near many of the sites are threatened by on-going erosion. G2 identified  subsoil conditions and assisted in development of corrective systems that are compatible with the soil conditions and the restricted access to the construction sites.

Fast Facts

Project Scope

Construction of erosion protection systems

G2 Services Provided

Geotechnical Engineering
Construction Engineering

Challenges/Solutions

  • Difficult access to the construction sites limited the choices for erosion protection.
  • G2 selected erosion protection systems to achieve the desired flow improvement characteristics.
  • G2 designed temporary earth support systems to provide protection to nearby utilities during stream bank improvement construction.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.