The Detroit Wayne County Metropolitan Airport constructed the Midfield Terminal Project which included construction of a new 11,500 square foot parking garage. The entire structure is approximately 1,600 feet long, 240 feet wide, and 10 stories tall, 3 stories of which are below grade. At the time of completion in 2001 it was the largest parking structure ever built at one time.

Fast Facts

Project Owner

Wayne County Airport Authority

G2 Services Provided

Geotechnical Engineering and Construction Engineering

Challenges/Solutions

  • Value engineered 16-inch diameter, 200 ton capacity augercast pile system to replace the designed steel driven piles, resulting in a quality, high capacity, and cost effective foundation system.
  • The augercast piles were the highest capacity ever used locally. G2 developed a rigorous load testing program to verify the capacities of the piles, including a combination of load tests: compression, tension, and lateral load tests.
  • Low strain integrity testing was performed on each augercast pile to confirm no discontinuities were present.