ITC Headquarters

Novi, Michigan

G2 provided construction engineering services during construction of this new $60-million headquarters, including site work and utility construction, foundation construction, structural steel, and bituminous and concrete paving.

Fast Facts

Project Owner

ITC Holdings

Scope

Six story, 188,000-square-foot headquarters with a control center and an attached two-story parking deck within the 86-acre site

G2 Services Provided

Geotechnical Engineering
Construction Engineering

Challenges/Solutions

  • During the geotechnical investigation, the team encountered a large peat and marl deposit within the proposed access drive alignment.
  • G2 performed a “rolling surcharge” to squeeze out the peat and marl. The rolling surcharge method consisted of excavating in front of a 30- to 35-foot-high sand pile while moving across the roadway alignment. The peat and marl squeezed out and was removed from the work area. The remaining surcharge pile was used to support the roadway.

Smart. Results. Fast. G2 designed and implemented an innovative geotechnical solution to eliminate challenging subsurface conditions, maintaining project schedule and budget.