Category Archives: Uncategorized

ACEC of Michigan Scholarships available for 2017

Mark Smolinski Principal G2 Consulting Group

Mark Smolinski
Principal
G2 Consulting Group

The American Council of Engineering Companies announced its annual scholarship program this month. The 2017 application is now available.

ACEC of Michigan’s Scholarship Program was created to promote the profession and to provide financial support to those individuals pursuing careers in engineering and surveying. The Council awards scholarships to deserving college students who have completed their freshman year and are enrolled in an ABET accredited engineering or surveying program. Recipients of the awards will be evaluated in the following areas: Work experience, extra-curricular and community activities, references, grade point average, and a written essay. Applicants must have worked for a private engineering, architectural or surveying firm in the past 24 months.

“G2 Consulting Group is a proud member of ACEC of Michigan,” says Mark Smolinski, principal at G2. “Our chapter awards approximately $12,000 annually to well-qualified students.”

The scholarship entry deadline is Friday, January 6. Please click on the link below for the ACEC Michigan 2017 Scholarship application. If you have any questions, please call the ACEC/Michigan office at 517-332-2066.

http://www.g2consultinggroup.com/wp-content/uploads/2016/10/2017_acecm_scholarships.pdf

 

FacebooktwitterlinkedinFacebooktwitterlinkedin

Telecom Carriers Expand Coverage with DAS • G2 Provides Environmental Due Diligence

Ben Youra Project Manager G2 Chicagoland

Ben Youra
Project Manager
G2 Chicagoland

In the last few years, wireless data traffic has increased exponentially. People are no longer only accessing the Internet at home or in the office, they are doing it wherever they are from their mobile device. Telecommunication carriers have come up with innovative ways to increase their network capacity. One solution is through the use of small cells. Distributed Antenna Systems (DAS) are another solution used to address the need for increased coverage and capacity of wireless networks.

DAS are typically associated with large facilities and venues that may have known peak usage (i.e., a sporting event or concert) as the systems are designed to address the potential for interference from building materials of the structure itself, as well as, simultaneous data usage from a large number of people in a concentrated area.  Thus DAS is a benefit to both the wireless carriers using the system, as well as, the venue owners in providing better service to smartphone users at these locations.
In 2016, G2 has provided environmental due diligence services in the form of Phase I Environmental Site Assessments (ESA), Phase II ESAs, and National Environmental Policy Act (NEPA) Reviews to its telecommunication clients proposing to install DAS at two venues in the greater Chicagoland area.
Our Phase I ESA for one of the projects found the site was utilized for heavy industrial purposes dating back to the 1950’s prior to the redevelopment of the parcel as a sporting venue in the early 2000’s. At least 16 underground storage tanks with two documented leaking incidents were associated with the historical industrial site within the overall property.  However, given the limited nature of the client’s proposed work below grade, we were able to tailor our scope of work for soil testing associated with the Phase II ESA to address only the areas to be impacted by the proposed telecommunications site development and to address the necessary parameters to satisfy the Illinois EPA’s Clean Construction and Demolition Debris requirements. The soil testing results were favorable and our client was able to proceed toward development of the site with no delays or extra costs incurred.
FacebooktwitterlinkedinFacebooktwitterlinkedin

Big-bore Harley dealer aims to be a destination

Farmington Hills — Harley-Davidson motorcycles is perhaps the ultimate lifestyle brand, and one of the nation’s largest Harley dealerships aims to be a lifestyle destination with a brewpub and restaurant just off the showroom floor.

READ MORE ABOUT MOTOR CITY HARLEY-DAVIDSON

G2 Consulting Group provided geotechnical services, as well as, special inspections and materials testing. The project was completed in record time!

Print

FacebooktwitterlinkedinFacebooktwitterlinkedin

G2 Chicagoland Recommends CCDD Services

Ben Youra Project Manager G2 Chicagoland

Ben Youra
Project Manager
G2 Chicagoland

Efficient Process Saves Time and Reduces Costs

Addressing soil characterization during the Geotechnical Investigation phase saves our clients time and money by certifying the soils during the early stages of the planning process. G2 recommends Clean Construction and Demolition Debris (CCDD) services to minimize additional expenses. CCDD is defined by the Illinois Environmental Protection Agency (EPA) as ”uncontaminated broken concrete without protruding metal bars, bricks, rock, stone, reclaimed asphalt, and soil generated from construction and demolition activities.”

Disposal of soils that cannot be utilized on site during grading is significantly less expensive at a clean fill facility. Analyzing soil and having certification forms in place early in the project stage helps remove potential delays and unplanned costs. Once site development begins, potential costs arise from stockpiling soils on site while waiting for lab results. These soils may then need to be disposed of at a regulated landfill.  Further, owners can utilize this information to obtain favorable pricing from contractors when their projects bid.

G2 Consulting Group reviews available environmental reports, as well as readily available information within the Illinois EPA’s databases to determine if there are significant environmental issues associated with the subject property or immediate adjoining properties.  Based on our review, we determine an appropriate number of soil samples and locations, as well as a scope for analytical testing parameters.

Soil samples are obtained during drilling operations performed in conjunction with our Geotechnical Investigation using proper environmental sampling protocol. Soil at the project site is visually assessed and screened in the field using a photo ionization detector (PID). Soil samples are selected for analytical testing based on visual observations, PID screenings, or using other pertinent data from our review.  Representative samples are selected and submitted to an accredited laboratory for analysis and comparison with the Illinois EPA’s “Maximum Allowable Concentrations of Chemical Constituents in Uncontaminated Soil Used as Fill Material”.  This analysis is used to determine if soils at the site meet the Illinois EPA’s criteria for disposal at a CCDD facility. Provided the material is determined to be non-impacted, a licensed Professional Engineer completes the Illinois EPA Form LPC-663 certifying that the soils are non-impacted.  It should be noted that final acceptance of the material is up to the individual landfill facility.

Smart. Results. Fast.

G2 Consulting Group’s Chicagoland office performs soil testing in conjunction with Geotechnical Investigations saving time and reducing costs.

 

 

 

 

 

FacebooktwitterlinkedinFacebooktwitterlinkedin

Smart. Results. Fast.

Times are tight.  There’s no slack in the schedule, and no money to burn.  This is our world.

Our geotechnical, geoenvironmental and construction engineers have delivered hundreds of telecommunications, land development and civil infrastructure projects for two decades.

Facing a demanding project?  Need to find a way to reduce project costs?  Looking for a competitive advantage?

Look to G2 Consulting Group.