Evergreen Road Gets a Makeover

It’s Orange Barrel season again in Michigan. Like most municipalities, the City of Southfield, MI, got to work reconstructing its main roads. Its a tight timeline to get it all done before winter hits, however, G2 Consulting Group prides itself  in Smart. Results. Fast.

In 2017, G2 Consulting Group provided materials testing services for the concrete reconstruction of Evergreen Road from 9 Mile Road to the Northwestern Highway Service Drive.  Florence Cement Company, working as a subcontractor for Dan’s Excavating, Inc., placed approximately 8,000 cubic yards of grade P1 Modified concrete as pavement with integral curb for the project.  Services were provided for OHM Advisors and the City of Southfield.

FacebooktwitterlinkedinFacebooktwitterlinkedin

ACEC/MI offers 2018 Michigan Educational Scholarships

Mark Smolinski Principal G2 Consulting Group

Mark Smolinski
Principal
G2 Consulting Group

The American Council of Engineering Companies (ACEC) of Michigan Education Scholarship Application is now available for 2018.

ACEC of Michigan’s Scholarship Program was created to promote the profession and to provide financial support to those individuals pursuing careers in engineering and surveying. Multiple scholarships are awarded each year in varying amounts. Last year, five university students received assistance.

To qualify, college students must have completed their freshman year and enrolled in an ABET accredited engineering or surveying program. Recipients of the awards will be evaluated in the following areas: Work experience, extra-curricular and community activities, references, grade point average, and a written essay. Applicants must have worked for a private engineering, architectural or surveying firm in the past 24 months.

“G2 Consulting Group is a proud member of ACEC of Michigan,” says Mark Smolinski, principal at G2. “Our chapter will award three to five scholarships to deserving students this year totaling approximately $12,000.”

The scholarship entry deadline is Friday, January 5, 2018. Please click on the link below for the ACEC of Michigan 2018 Education Scholarship Application.

ACEC of Michigan 2018 Educational Scholarship Application

FacebooktwitterlinkedinFacebooktwitterlinkedin

Science and Engineering Center Opens at UDJHSA

The Science and Engineering Center opened its doors to students in 2016 and is the largest addition to the campus since the main school building was constructed in 1931. The center represents the largest dollar investment in science and technology at any Michigan high school in recent years and positions U of D Jesuit as a leader in STEM education in Southeast Michigan.

Fast Facts

Scope

The new $16 million, four-story, 40,000 square foot addition artfully blends historic features of the original structure with artwork and iconography. Located between the main school building and Jesuit residence, the state-of-the-art facility doubles the classroom and laboratory space for biology, chemistry, and physics; adds laboratory space for eco-car and robotics programs, engineering activities; and it includes dedicated classrooms and laboratories for seventh and eighth grade students.

G2 Services

Working with Wold Architects and McCarthy and Smith, Inc., G2 Consulting Group provided geotechnical engineering services and performed special inspections and materials testing during construction.

Challenges / Solutions

Challenged with upper weak or loose sands with more competent clay soils deeper, G2 performed extensive analysis to provide improved support for the building foundations..

Smart. Results. Fast.

G2’s value engineering helped optimize foundation sizes and reduce overall construction costs.

 

FacebooktwitterlinkedinFacebooktwitterlinkedin

Holiday Inn Express opens its doors

Plymouth Township, Michigan

A new Holiday Inn Express was constructed along the east side of Beck Road, north of M14, in Plymouth Township, Michigan and completed in the Spring of 2016..

Fast Facts

Scope

The four-story, 67,366 square foot structure, with a walk-out basement, services the local business parks and adjacent USA hockey arena. The hotel has 107 rooms, a conference room, pool, and exercise facilities.

G2 Services Provided

Working with Emmett Contracting, G2 Consulting Group provided special inspections / materials testing during construction including evaluation of earthwork operation and utility backfill, foundation construction, masonry evaluation, structural steel evaluation, and interior floor slab evaluation. Test methods included compaction control of fill soils, bearing capacity of supporting soils, compressive strength testing, and slump and trained air content evaluation of concrete, and mortar proportions, and grout specimen strength testing for masonry materials.

Challenges / Solutions

Challenged by upper weak fill soils with more competent clay soils deeper, G2 worked closely with the foundation contractor to ensure that foundations were supported on suitable bearing soils per the recommendations of the geotechnical report.

Smart. Results. Fast.

G2’s value engineering helped to optimize foundation construction and reduce overall construction costs.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Korean United Methodist Church

Troy, Michigan

The Korean United Methodist Church in Troy, MI, discovered they needed more space to worship and gather together for their growing church community. They turned to Cunningham-Limp Development Company in early January 2016 to assist them in conceptualizing a new addition for their church.

Fast Facts

Project Owner

Korean United Methodist Church

Scope

The Korean United Methodist Church constructed a single-story, steel-framed slab-on-grade addition to its existing facility. It was also necessary to construct a new parking area, provide associated utilities and create a 4-1/2 foot deep detention pond. By the end of the summer of 2016, it was completed.

G2 Services Provided

Geotechnical Investigation

Special Inspections and Materials Testing

Challenges / Solutions

As on many of Cunningham-Limp Development Company projects, G2 Consulting Group provided the geotechnical investigation prior to construction and construction engineering services during construction. These services included: observing earthwork operations and utility installation; performing foundation inspection and concrete inspection for foundations, flatwork and site concrete; performing structural steel evaluation; and observing bituminous concrete and Portland cement concrete pavement construction.

G2 determined and evaluated the general subsurface conditions at the site and developed related foundation recommendations for support of the proposed structure. G2 also recommended new pavement design and provided construction considerations for the new development.

How did we accomplish “Smart. Results. Fast”?

Significant geotechnical investigation was performed in a short period of time. G2 provided preliminary design recommendations shortly after completion of the field report which allowed the construction team to move forward quickly with the project. During construction, G2 observed construction activities and advised the contractor accordingly to conform with project specifications.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Beacon Square Senior Living Center

Orion Township, Michigan

Pomeroy Living finished construction of Beacon Square Senior Living Center in Orion Township, Michigan, in 2017. Beacon Square Orion is a senior living community that houses 161 residents and provides independent living, assisted living and memory care residences. The new facility is designed with the latest in senior standards in resident care, life enrichment and wellness services for all generations and living situations. KIRCO MANIX is the general contractor.

Fast Facts

Project Owner

Pomeroy Senior Living

Scope

G2 Consulting Group performed a geotechnical investigation for earthwork operations, foundation design, and construction considerations and performed special inspections and materials testing services during construction.

G2 professionals explored the site during the geotechnical investigation to determine and evaluate general subsurface conditions and developed related foundation recommendations for support of the proposed structure. This included pavement recommendations and construction considerations related to its development.

G2’s special inspections / materials testing scope of services included evaluating earthwork operations, utility installation, retaining wall installation observation, foundation inspection and concrete inspection for foundations, flatwork, and site concrete, performing structural steel evaluation, masonry inspection, and bituminous paving.

G2 Services Provided

Geotechnical Investigation

Special Inspections and Materials Testing

Challenges / Solutions

This three-story, slab-on-grade building has a 69,585 square-foot footprint. It required significant earthwork and grade balancing across the site. Engineered fill was placed within the building pad and parking lot areas. In addition, there were pockets of organic soils that were removed and replaced with engineered fill prior to construction.

How did we accomplish “Smart. Results. Fast”?

G2 Consulting Group provided cost-effective solutions to keep the project moving forward during a tight construction schedule.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Detroit Country Day School Black Box Theater Expansion

Detroit Country Day School in Beverly Hills, MI., expanded its performing arts facility to enhance its nationally recognized program. The school provides students with a well-rounded liberal arts education in academics, athletics, and the arts. The Fine and Performing Arts Department at Country Day School provides a comprehensive arts program to support the school’s commitment to superior education. Drama, theater, music, visual arts, and dance courses enable students to reach their full potential and encourage students to experiment with and develop creativity.

Fast Facts

Project Owner

Detroit Country Day School

Scope

The 6,300 square-foot, two-story addition features a full cat walk and tension grid with highly specialized mechanical and electrical systems. In addition, spaces include two offices and staging scene shop for performances.

Working with Cunningham-Limp, G2 Consulting Group provided geotechnical engineering and special inspection / material testing for the new Black Box Theater Expansion.

G2 provided special inspections and material testing during construction including evaluation of earthwork operation and utility backfill, foundation construction, masonry evaluation, pre-cast plank and structural steel evaluation, and interior floor slab and site concrete evaluation.

G2 Services Provided

Geotechnical Engineering
Special Inspection and Materials Testing

Challenges/Solutions

  • Tight timelines while working in an active school campus environment.

Smart. Results. Fast. Site conditions were less than ideal. G2 developed cost effective solutions and offered real time response to testing and inspection needs, maintaining an aggressive construction schedule.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Telecommunication Sites In U.S. and Canada

 

“Can you hear me now?” “That’s powerful.”  For more than two decades, G2 Consulting Group has helped North America stay connected.  G2 engineers are registered in 30+ states and Canada. We perform geotechnical and tower foundation investigations for numerous companies on telecommunication sites. Oftentimes these sites are located in remote areas which require a significant amount of planning prior to site visits to ensure work is completed as efficiently as possible since return trips to sites would be cost prohibitive. G2 uses an extensive network of drillers and excavators across the country to complete such projects on time and on budget.

Fast Facts

Project Owner
Several major telecommunication companies

Project Scope
Geotechnical Investigation
Tower Foundation Investigation

Services Provided
Geotechnical Investigation
Tower Foundation Investigation

Challenges/Solutions

G2 Consulting Group often performs geotechnical and tower foundation investigations for telecommunication sites at remote locations. These sites require efficient use of time and resources to keep projects within schedule and on budget.

Telecommunication companies are under increased pressures to provide quality cellular services to their customers quickly, whenever and wherever. G2’s expertise provides solutions to each situation at each site. Our vast network of drillers enables us to schedule field operations anywhere in the U.S. We know which methods to use and the proper equipment needed to map foundations accurately and avoid delays.

Smart. Results.Fast.G2 meets tight schedules for our telecommunications clients. We use our vast network of drillers to schedule field operations and expedite projects. We plan, evaluate, and act knowing which methods and equipment to use to avoid delays.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Shield Material Handling

Auburn Hills, Michigan

In June 2016, Cunningham-Limp Development Company completed construction of a new multimillion-dollar facility for Korean-based Shield Material Handling. The 75,050 square-foot warehouse and distribution structure is located in Auburn Hills, MI. It provides complete logistics services to tier one automotive suppliers in the region. It also provides warehousing and distribution services for products and parts.

Fast Fact

Project Owner

Cunningham-Limp Development Company

Scope

G2 Consulting Group performed a geotechnical investigation, phase 1 environmental site assessment, and provided special inspections/materials testing.

Prior to construction, G2 explored the site to determine and evaluate general subsurface conditions and developed related foundation recommendations for support of the proposed structure, as well as, pavement recommendations, and construction considerations related to the development. Our special inspections / materials testing scope of our services included evaluating earthwork operations; utility installation; observing retaining wall installation; performing foundation inspection and concrete inspection for foundations, flatwork, and site concrete; performing structural steel evaluation, masonry inspection, and bituminous paving.

G2 Services Provided

Geotechnical Investigation / Special Inspections and Materials Testing

Challenges / Solutions

The project was challenged with poor subsurface conditions that required the removal and replacement of soft/loose uncontrolled fill soils with engineered fill to support the foundations and floor slab. In addition, a variety of subgrade stabilization techniques were used to minimize removal of non-organic fill soils for support of pavements.

How did we accomplish “Smart. Results. Fast”?

With any design/build project, turnaround time on project deliverables is critical to meeting construction milestones.  G2 performed this significant geotechnical investigation in a short period of time and provided preliminary design recommendations shortly after completion of field report to allow the design / build team to move forward with their design. 

FacebooktwitterlinkedinFacebooktwitterlinkedin

G2 Consulting Group Seeks Qualified Field Technicians

Bruce J. Wilberding, P.E. Principal/Project Consultant

Bruce J. Wilberding, P.E.
Principal/Project Consultant

G2 Consulting Group is currently look for qualified candidates to fill Field Technician positions in its Troy and Ann Arbor offices. G2 clients rely on the firm’s responsive attitude and ability to quickly mobilize an experienced team of professionals. G2 clients include Fortune 500 companies, major utilities, state and local government agencies, and leading architectural, engineering, and construction firms.

Principal duties consist of construction observation and testing, and laboratory testing within the construction engineering services group. Testing duties include earthwork, foundation, concrete, steel, masonry, and paving related activities at job sites. Travel outside of the Detroit metropolitan area may be required. G2 will make efforts to provide a company vehicle available from its current fleet. However, use of a personal vehicle may be required to perform the duties of this position, particularly during training. The candidate should expect to work overtime and occasional weekend days.

Candidates that have Level 1 Concrete Field Testing Technician Certification, Density Control Certification, or Hot Mix Asphalt Level 1 Certification are desired.  Ideal candidates should have good writing and communication skills, and are detail-oriented. In addition, candidates should have an excellent driving record, the ability to work outside in various weather conditions, and the ability to lift 50 pounds and stand for long periods of time.

G2 Consulting Group offers full-time employees a comprehensive range of employee benefits including: health insurance, dental coverage, 401(k), comp time, paid holidays, and tuition reimbursement. Typical hourly rate range for field technicians is $15 to $20, depending on experience and possession of above mentioned certifications.

If you are interested in applying for the position of field technician, please contact Bruce Wilberding at (248) 680-0400, Jason Stoops at (734) 390-9330, or visit the G2 website at www.g2consultinggroup.com.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Small Cells / Distributed Antenna Systems

Throughout United States

DAS

Wireless companies building out small cell networks or in-building systems are required to consider whether their proposed actions may have an adverse effect on historic resources. G2 Consulting Group performs regulatory compliance reviews and tribal consultations for proposed small cell and distributed antenna system (DAS) facilities. These reviews ensure our clients conform with the Federal Communications Commission’s (FCC) Nationwide Programmatic Agreement (NPA) requirements. In the case of DAS installations, hazardous materials (asbestos and lead) surveys and/or abatement work may be warranted to facilitate the safe installation of equipment associated with the DAS. G2 oversees both hazardous material surveys and abatement projects for clients in the telecommunications sector.

Fast Facts

Project Owners

Tower and Fiber Companies, Carriers, and Wireless Service Providers

 G2 Services Provided

Section 106 Review

National Environmental Policy Act Review (NEPA)

Tribal Consultation

Hazardous Materials (Asbestos/Lead) Surveys for In-building Systems

 

Challenges/Solutions

    • G2 assists our clients with interpretation of both the applicable regulatory framework set forth in the FCC’s Nationwide Programmatic Agreement for the Collocation of Wireless Antennas (most recently amended in August 2016), as well as, any carrier-specific processes associated with regulatory review for proposed small cell sites.
    • G2 quickly reviews site information (i.e., project type, pole height, equipment volume, etc.) and the proposed location of small cell nodes to ascertain if they meet criteria for any exemptions from Section 106 Review under the most recent FCC guidelines.
    • G2 provides a written summary with supporting documentation (i.e., state and local maps depicting historically sensitive areas, National Register of Historic Places review, etc.) to clients indicating regulatory compliance due diligence has been completed and no further actions are warranted. If sites are determined to be on or within a designated historic resource, G2 works with an architectural historian, as well as, local, state, and tribal agencies, to achieve a favorable determination or advise clients in the early planning process if a site may involve complications.

Smart. Results. Fast. Telecommunications projects are extremely time-sensitive. G2 conducts thorough Section 106 and NEPA Reviews expediently to provide information to identify sites that require additional regulatory due diligence work in order to maintain client schedules.  Additionally, G2 offers input to clients with respect to site design and/or location to meet certain exemption criteria for Section 106 or NEPA Reviews to minimize costs.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Magna Seating HQ – “In The Driver’s Seat”

Jason Stoops, P.E Ann Arbor Office Manager

Jason Stoops, P.E
G2 Project Manager

Congratulations to Magna Seating of America, Inc. and Cunningham-Limp on the recent opening of Magna’s new headquarters in Novi, MI.

G2 Consulting Group was proud to perform the geotechnical investigation and provide special inspections/materials testing for the new $48 million, 180,000 square foot, three-story facility which will consolidate activities into a single facility to house engineering, research and development, and sales and marketing teams.

As with all Cunningham-Limp projects, I was impressed with the speed and short turn around time to deliver the new headquarters. Cunningham-Limp’s design build services and collaborative approach allows their design subconsultants to work seamlessly with them during the construction process to deliver an outstanding project.

The video below shows the construction process from dirt to delivery.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Magna Seating of America, Inc.

Novi, Michigan

 

 

G2 Consulting Group performed a geotechnical investigation and provided special inspections/materials testing for the new $48 million, 180,000 square foot, three-story Magna Seating of America headquarters in Novi, MI.  Site paving, truck docks, site utilities, and a retaining wall were also constructed in association with the project. Magna Seating will consolidate activities into a single facility to house engineering, research and development, and sales and marketing teams.

Magna International is a leading global automotive supplier with 316 manufacturing operations and 87 product development, engineering and sales centers in 29 countries. The company has approximately 133,000 employees. Its product capabilities include producing body, chassis, interior, exterior, seating, power train, electronic, vision, closure and roof systems and modules, as well as complete vehicle engineering and contract manufacturing.

Fast Facts

Project Owner

Magna International, Inc.

Scope

G2 Consulting Group explored the site to determine and evaluate general subsurface conditions and developed related foundation recommendations for support of the proposed structure, pavement recommendations, and construction considerations related to the development.  Our special inspections / materials testing scope of our services included evaluating earthwork operations, utility installation, retaining wall installation observation, performing foundation inspection and concrete inspection for foundations, flatwork, and site concrete, performing structural steel evaluation, masonry inspection, and bituminous paving

G2 Services Provided

Geotechnical Investigation
Special Inspections and Materials Testing

Challenges / Solutions

Significant grade fills of up to 16 feet and grade cuts of up to five feet required close evaluation of engineered fill placement. Significant challenges with poor subsurface conditions required the removal and replacement of soft/loose fill soils with engineered fill to support the foundations and floor slab, as well as, the removal and replacement of unsuitable organic soils within the retaining wall development area. In addition, a variety of subgrade stabilization techniques were used to minimize removal of non-organic native soils for support of engineered fill.

Smart. Results. Fast. 

With any design/build project, turnaround time on project deliverables is critical to meeting construction milestones. G2 performed this significant geotechnical investigation in a short period of time and provided preliminary design recommendations shortly after completion of the field report to allow the design/build team to move forward with their design.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Civil crew unearths archaeological remains at cell tower site

Ben Youra Project Manager G2 Chicagoland

Ben Youra
Project Manager
G2 Chicagoland

As reported this month in wirelessestimator.com, a civil crew unearthed what was determined to be human remains while excavating at an existing cell tower site. It is believed the remains were part of an unmarked portion of an adjacent historic cemetery. According to the post, the tower is not registered in the FCC’s database.

http://wirelessestimator.com/articles/2016/civil-workers-unearth-a-skull-and-other-bones-at-s-c-cell-site/

While findings like this are extremely rare, this occurrence highlights the need to perform proper due diligence work on proposed tower sites during the National Environmental Policy Act (NEPA) Review process.  In 2015, G2 Consulting oversaw a project associated with a proposed tower site near Lexington, KY. During the NEPA-related work, over 35 pre-historic and historic artifacts were discovered during a Phase I archaeological survey.  The contracted archaeologist determined an enhanced scope of work to ascertain if any intact archaeological resources were present in the project site.

G2 facilitated coordination for concurrence on the enhanced scope of work seeking input from the Kentucky Heritage Council (SHPO), the FCC’s Federal Preservation Officer, and the consulting tribal entities for that area.

G2 worked with the various entities to agree on an approach in a timely manner. The Enhanced Phase I Archaeological Investigation determined that historical agricultural activities within the parcel had resulted in previous disturbance. It was determined that the project should proceed as development of the proposed communications tower would not result in disturbance of any intact historical resources.

G2 was able to utilize its experience to convey fieldwork findings to State, Federal, and Tribal entities and ultimately get clearance for the project with relatively minimal project delays.

G2 advises its clients in every NEPA Report, that should archaeological materials or human remains be encountered prior to or during construction of their telecommunications facilities, construction activities should cease and the SHPO, the Native American tribal entities, and other consulting parties must be contacted for further evaluation.

FacebooktwitterlinkedinFacebooktwitterlinkedin

ACEC of Michigan Scholarships available for 2017

Mark Smolinski Principal G2 Consulting Group

Mark Smolinski
Principal
G2 Consulting Group

The American Council of Engineering Companies announced its annual scholarship program this month. The 2017 application is now available.

ACEC of Michigan’s Scholarship Program was created to promote the profession and to provide financial support to those individuals pursuing careers in engineering and surveying. The Council awards scholarships to deserving college students who have completed their freshman year and are enrolled in an ABET accredited engineering or surveying program. Recipients of the awards will be evaluated in the following areas: Work experience, extra-curricular and community activities, references, grade point average, and a written essay. Applicants must have worked for a private engineering, architectural or surveying firm in the past 24 months.

“G2 Consulting Group is a proud member of ACEC of Michigan,” says Mark Smolinski, principal at G2. “Our chapter awards approximately $12,000 annually to well-qualified students.”

The scholarship entry deadline is Friday, January 6. Please click on the link below for the ACEC Michigan 2017 Scholarship application. If you have any questions, please call the ACEC/Michigan office at 517-332-2066.

http://www.g2consultinggroup.com/wp-content/uploads/2016/10/2017_acecm_scholarships.pdf

 

FacebooktwitterlinkedinFacebooktwitterlinkedin

Country Club of Detroit Athletic Facility

G2 Consulting was retained by McCarthy and Smith, Inc., to design a support system so the construction team could excavate underneath the original “natatorium wing” of the 1930s historic clubhouse. The renovation plans called for relocation of the club’s popular bowling facility to the lower level location previously occupied by an indoor swimming pool, which had been out of use for decades.

Club management’s direction that the building’s architectural character and footprint not be altered in any way created an interesting engineering challenge since the team would need to excavate underneath the existing structure without disturbing it.  Adding to the challenge, the underlying soil conditions were poor with clay along one side of the structure and wet sand along the other.  After considering numerous approaches, the team decided on a series of underpinnings, essentially putting the building on stilts, and then pouring concrete foundation walls to encapsulate the stilts, providing stability for the renovations to occur in the short term and adequate bearing for the long term.

Fast Facts

Project Owner

Country Club of Detroit

Scope

G2 Consulting Group provided underpinning design of three (3) perimeter walls and one interior column line.  G2 designed temporary shoring consisting of “push piles” along the perimeter piles and an open cut excavation along with support beams for the interior column line. G2 also provided design of backfill methods which employed Reinforced Earth Technology.

G2 Services Provided

Geotechnical and Design Engineering Services

Earth Retention, Underpinning, and Reinforced Earth Design

Challenges/Solutions

  • Ground conditions prevented traditional underpinning techniques. G2 designed and developed an earth retention system to access exterior footing. A unique backfill technique utilized reinforced earth to reduce wall pressures on Country Club of Detroit perimeter wall resulting in significant savings to project.
  • G2 maintained traffic flow to the Country Club of Detroit entrance while working on project.

Smart. Results. Fast. G2’s innovative geotechnical engineering approach expedited the technically complex project resulting in significant savings to the Owner.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Telecom Carriers Expand Coverage with DAS • G2 Provides Environmental Due Diligence

Ben Youra Project Manager G2 Chicagoland

Ben Youra
Project Manager
G2 Chicagoland

In the last few years, wireless data traffic has increased exponentially. People are no longer only accessing the Internet at home or in the office, they are doing it wherever they are from their mobile device. Telecommunication carriers have come up with innovative ways to increase their network capacity. One solution is through the use of small cells. Distributed Antenna Systems (DAS) are another solution used to address the need for increased coverage and capacity of wireless networks.

DAS are typically associated with large facilities and venues that may have known peak usage (i.e., a sporting event or concert) as the systems are designed to address the potential for interference from building materials of the structure itself, as well as, simultaneous data usage from a large number of people in a concentrated area.  Thus DAS is a benefit to both the wireless carriers using the system, as well as, the venue owners in providing better service to smartphone users at these locations.
In 2016, G2 has provided environmental due diligence services in the form of Phase I Environmental Site Assessments (ESA), Phase II ESAs, and National Environmental Policy Act (NEPA) Reviews to its telecommunication clients proposing to install DAS at two venues in the greater Chicagoland area.
Our Phase I ESA for one of the projects found the site was utilized for heavy industrial purposes dating back to the 1950’s prior to the redevelopment of the parcel as a sporting venue in the early 2000’s. At least 16 underground storage tanks with two documented leaking incidents were associated with the historical industrial site within the overall property.  However, given the limited nature of the client’s proposed work below grade, we were able to tailor our scope of work for soil testing associated with the Phase II ESA to address only the areas to be impacted by the proposed telecommunications site development and to address the necessary parameters to satisfy the Illinois EPA’s Clean Construction and Demolition Debris requirements. The soil testing results were favorable and our client was able to proceed toward development of the site with no delays or extra costs incurred.
FacebooktwitterlinkedinFacebooktwitterlinkedin

Country Club of Detroit’s renovation focuses on fitness

Project Manager Mark Stapleton designed the innovative approach to the Country Club of Detroit's historic renovation.

Project Manager Mark Stapleton designed the innovative approach to the Country Club of Detroit’s historic renovation.

Detroit — G2 Consulting Group provided geotechnical engineering services for the historic Country Club of Detroit renovation project. The club required that the footprint or historical architecture of its existing clubhouse not be altered. The $9 million renovations include a new fitness center and bowling lanes at the bottom level of the building that required the replacement of an emptied indoor swimming pool that had been closed since the early 1930s.

READ MORE ABOUT THE COUNTRY CLUB OF DETROIT RENOVATIONS

G2 Consulting Group provided geotechnical services and found innovative and cost-effective solutions for this historic site’s renovations.

FacebooktwitterlinkedinFacebooktwitterlinkedin

Small Cell Sector Opportunities Increase in Telecom Market

Ben Youra Project Manager G2 Chicagoland

Ben Youra
Project Manager
G2 Chicagoland

G2 Consulting Group – Chicagoland has provided its telecommunication clients regulatory compliance services for over 15 years. Over the past several years, G2 Consulting has seen increased opportunities in the small cell sector of the telecommunications market as carriers attempt to keep up with the need for increased network capacity brought on by consumers’ ever-increasing demand for data on their mobile devices.

This is a dynamic area of the telecommunications business given that the deployment of small cell networks is a relatively recent development and we do anticipate carriers devoting more of their resources to expanding their small cell networks going forward. Further, the regulatory framework (National Environmental Policy Act) in place for years to address new cell tower development must also be applied to the small cells and it isn’t always a perfect fit. To that end, we have seen the Federal Communication Commission (FCC) working to streamline the regulatory process to fit the generally lower-impact of small cells with respect to NEPA concerns. G2 is currently working with our clients and awaiting interpretations from the carrier’s legal and regulatory departments to address the most recent attempts to streamline the regulatory process offered for small cell facilities as put forth by the FCC in August.

READ:   Wireless Telecommunications Bureau  Announces Execution of First Amendment to the Nationwide Programmatic Agreement for the Collocation of Wireless Antennas

G2 always stays in front of new developments in the small cell sector. To that end, we are looking forward to attending the upcoming Above Ground Level conference in Chicago on October 4th.  We hope to hear thoughts from the speakers as to where this sector is headed, as well as, their perceptions with respect to the recent regulatory changes and how the industry may incorporate these changes. G2 is always interested in bringing back information we can provide to our clients so they can make well-informed decisions on their projects.

READ: Above Ground Media Group Conference – Chicago IL

FacebooktwitterlinkedinFacebooktwitterlinkedin

G2 “Maps It Out” For Tower Owners/Carriers

Tony Poisson, Office Manager - Chicagoland

Tony Poisson, Office Manager – Chicagoland

As available tower space becomes more limited, it becomes imperative to tower owners and carriers to make the most of the existing space that is available. Oftentimes, this involves performing a structural analysis of the tower to determine its load carrying capacity and ability to support additional antenna structures. The existing foundation must be evaluated as part of this structural analysis.

What happens when the original foundation plans, geotechnical report, or as-built plans are not available? At this point it becomes necessary to perform an investigation to determine the subsurface conditions at the site and foundation type and dimensions. G2 has performed hundreds of such investigations across the United States for numerous clients including Semaan Engineering, Fullerton Engineering, Terra Consulting Group, W-T Communication Group, and all the major telecommunication tower owners and carriers.

G2 has the ability and network of drillers across the country to perform geotechnical investigations almost anywhere. Typically, our foundation investigations utilize low-strain pile integrity test methods to evaluate drilled piers. We also utilize excavation methods, as necessary, to determine foundation information. Our past investigations have also included evaluation of guyed anchor bars for corrosion below grade.

We also maintain a database of the thousands of tower sites we have worked on over the past 20 years and may be able to locate previous geotechnical reports or foundation designs, potentially saving a substantial amount of time and money required for new investigations.

READ:  Analysis of Existing Tower Foundations

FacebooktwitterlinkedinFacebooktwitterlinkedin