Accelerated Bridge Replacement in Rhode Island

Bruce J. Wilberding, P.E. Principal/Project Consultant

Bruce J. Wilberding, P.E.
Principal/Project Consultant

Motorists constantly complain about the condition of roads and bridges, and rightly so.  The engineering community is listening and developing new ways to repair infrastructure with as little disturbance to the motoring public as possible.  Take a look at this time lapse video of a bridge replacement, and the unique repair of the structure including staged construction to maintain traffic flow and use of precast pier/bridge deck elements.

Also shows that civil engineers are down right cool!!

FacebooktwitterlinkedinFacebooktwitterlinkedin

Leave a Reply

Your email address will not be published. Required fields are marked *